6 types of construction docs feasibility, conceptual, preliminary, detailed, unit price, bid packages
4 types of costs direct, indirect, overhead, taxes & profit
Difference btn lowest bid and the most accurate bid lowest bid may come form unqualified contractor where as accurate bid should reflect true cost
4 common bid mistakes mathematical, illegible handwriting, misplaced decimals, omission of materials
5 types of unethical bidding practices bid shopping, bid peddling, bid cutting, low-ball bidding, bid-rigging
Calculate BMF of 2IN x 4IN stud that is 16FT 10.66
How many studs needed in a 50FT wall that is 18IN O.C. 50 div by 1.5 = 33.3